# Unit 19 — CI and compatibility
## Objectives
Read the workflow as a list of gates, and refuse to mark a gate PASS without its log.
## Why
The Stage 0 Linux run is real (E18, E19). The file has since gained ABI checks, resources, and a consumer. Those steps are not that log.
## Model
```text
push / pull_request
ubuntu-24.04
G0 doctor
mix compile
G1 check-abi
G0–G4, G6, G7 via mix test
G5 consumer and umbrella
upload /tmp/evidence
no job: macOS ARM64, NVIDIA, Linux GPU
```
## Theory
`.github/workflows/linux.yml` pins OTP 28.3.1, Elixir 1.20.2, and `requirements.txt` (Mojo, not MAX). Artifacts are doctor output, the ABI log, ExUnit, the fingerprint, the manifest, the link inputs, the sha256 of `otp_nif.mojo`, the commit, and `uname`.
A negative control is inside G1: `enif_make_lonq` must be rejected. Another is inside G6: `bad_schedule.json` must exit 1. G7's abort probe must kill a child.
G9 is not a step. Adding a step that runs `true` and names it GPU would be a fabricated pass. The script that knows how to fail closed is `scripts/gpu-batch.sh`, and it is not in this workflow.
Intel macOS is not ARM64. The workflow does not use `macos-latest`.
## Lab
Read `.github/workflows/linux.yml` and `docs/stages/s9.md`. After a push, compare the artifact `commit.txt` with `git rev-parse HEAD` of the commit you meant.
## Expected
Until that artifact exists for this commit, `docs/stages/report.md` says Linux stages 1–10 are PENDING.
## Code
The import gate and the ExUnit suite are the regression fixtures. A new undefined symbol fails `check-imports.sh`. A broken `add` fails `test/poc_test.exs`.
## Failure
Copying E19's `11 passed` into a sentence about resources. The old run did not compile `native/own.mojo`.
## Exercise
What should a developer do before calling the two-platform CPU milestone complete?
## Answer
Push, wait for the Ubuntu job, and attach that log as a new ledger row. A green badge on an older commit is not this tree.