defmodule Finance.Depreciation do
@moduledoc """
Writing an asset down from its `cost` to its `salvage` value over its `life`.
`sln/3` spreads the loss evenly; `syd/4`, `ddb/5`, and `db/5` are accelerated
methods that depreciate more early on and return the amount for a single
`period` (counting from 1).
"""
import Finance.Shared, only: [unwrap!: 1]
@type error :: Finance.error()
@doc """
Computes straight-line depreciation: the equal amount an asset is written down
by each period as it declines from its `cost` to its `salvage` value over
`life` periods.
This is the plainest of the depreciation methods — it spreads the loss in
value evenly, so every period sees the same write-down.
iex> Finance.Depreciation.sln(10_000, 1_000, 5)
{:ok, 1800.0}
"""
@spec sln(number, number, number) :: {:ok, float} | {:error, error}
def sln(cost, salvage, life)
when is_number(cost) and is_number(salvage) and is_number(life) do
if life == 0 do
{:error, :undefined}
else
{:ok, (cost - salvage) / life * 1.0}
end
end
@doc "Same as `sln/3`, but returns the value directly and raises `ArgumentError` on error."
@spec sln!(number, number, number) :: float
def sln!(cost, salvage, life), do: cost |> sln(salvage, life) |> unwrap!()
@doc """
Computes sum-of-years'-digits depreciation for a single `period` (counting from
1).
This is an accelerated method: it charges more depreciation in the early
periods and less later on, which suits assets that lose most of their value up
front. It returns the write-down for the one `period` you ask about rather than
the whole schedule.
iex> Finance.Depreciation.syd(10_000, 1_000, 5, 1)
{:ok, 3000.0}
iex> Finance.Depreciation.syd(10_000, 1_000, 5, 5)
{:ok, 600.0}
"""
@spec syd(number, number, number, number) :: {:ok, float} | {:error, error}
def syd(cost, salvage, life, period)
when is_number(cost) and is_number(salvage) and is_number(life) and is_number(period) do
if life <= 0 or period < 1 or period > life do
{:error, :undefined}
else
{:ok, (cost - salvage) * (life - period + 1) * 2 / (life * (life + 1)) * 1.0}
end
end
@doc "Same as `syd/4`, but returns the value directly and raises `ArgumentError` on error."
@spec syd!(number, number, number, number) :: float
def syd!(cost, salvage, life, period), do: cost |> syd(salvage, life, period) |> unwrap!()
@doc """
Computes double-declining-balance depreciation for a single `period`.
This is another accelerated method: each period it takes a fixed fraction of
the remaining book value, so the write-down shrinks as the asset ages. The
`factor` sets how aggressive that fraction is, defaulting to `2` for the usual
double-declining rate. The depreciation is capped so it never drives the book
value below `salvage`.
iex> Finance.Depreciation.ddb(10_000, 1_000, 5, 1)
{:ok, 4000.0}
iex> Finance.Depreciation.ddb(10_000, 1_000, 5, 2)
{:ok, 2400.0}
"""
@spec ddb(number, number, number, number, number) :: {:ok, float} | {:error, error}
def ddb(cost, salvage, life, period, factor \\ 2)
when is_number(cost) and is_number(salvage) and is_number(life) and is_number(period) and
is_number(factor) do
n = trunc(period)
if ddb_valid?(life, factor, period, n) do
{:ok, declining_balance(cost, salvage, factor / life, n)}
else
{:error, :undefined}
end
end
defp ddb_valid?(life, factor, period, n) do
life > 0 and factor > 0 and period == n and n >= 1 and n <= life
end
@doc "Same as `ddb/5`, but returns the value directly and raises `ArgumentError` on error."
@spec ddb!(number, number, number, number, number) :: float
def ddb!(cost, salvage, life, period, factor \\ 2) do
cost |> ddb(salvage, life, period, factor) |> unwrap!()
end
@doc """
Computes fixed-declining-balance depreciation for a single `period`.
Like `ddb/5`, this applies a constant rate to the declining book value, but the
rate is derived directly from `cost`, `salvage`, and `life` (and rounded to
three decimal places, matching what spreadsheets do). Use `month` to say how
many months the asset was in service during its first year; it defaults to a
full `12`, and a shorter first year spills the remaining depreciation into an
extra final period.
iex> Finance.Depreciation.db(10_000, 1_000, 5, 1)
{:ok, 3690.0}
iex> Finance.Depreciation.db(10_000, 1_000, 5, 2)
{:ok, 2328.39}
"""
@spec db(number, number, number, number, number) :: {:ok, float} | {:error, error}
def db(cost, salvage, life, period, month \\ 12)
when is_number(cost) and is_number(salvage) and is_number(life) and is_number(period) and
is_number(month) do
n = trunc(period)
if db_valid?(cost, salvage, life, month, period, n) do
{:ok, fixed_declining(cost, salvage, life, n, month)}
else
{:error, :undefined}
end
end
@doc "Same as `db/5`, but returns the value directly and raises `ArgumentError` on error."
@spec db!(number, number, number, number, number) :: float
def db!(cost, salvage, life, period, month \\ 12) do
cost |> db(salvage, life, period, month) |> unwrap!()
end
defp db_valid?(cost, salvage, life, month, period, n) do
cost > 0 and salvage >= 0 and life > 0 and month >= 1 and month <= 12 and
period == n and n >= 1 and n <= life + 1
end
# Walk periods 1..period, carrying accumulated depreciation, and return the
# amount for the final period. Depreciation stops at the salvage floor.
defp declining_balance(cost, salvage, rate, period) do
Enum.reduce(1..period, {0.0, 0.0}, fn _p, {accumulated, _dep} ->
book = cost - accumulated
dep = max(min(book * rate, book - salvage), 0.0)
{accumulated + dep, dep}
end)
|> elem(1)
end
defp fixed_declining(cost, salvage, life, period, month) do
rate = Float.round(1 - :math.pow(salvage / cost, 1 / life), 3)
Enum.reduce(1..period, {0.0, 0.0}, fn p, {accumulated, _dep} ->
dep = db_period(cost, accumulated, rate, life, month, p)
{accumulated + dep, dep}
end)
|> elem(1)
end
defp db_period(cost, _accumulated, rate, _life, month, 1), do: cost * rate * month / 12
defp db_period(cost, accumulated, rate, life, month, period) do
if period <= life do
(cost - accumulated) * rate
else
# The partial last period when the first year was shorter than 12 months.
(cost - accumulated) * rate * (12 - month) / 12
end
end